How to brief a production house

A good brief is short, specific about constraints, and open about what you do not know.

What a brief needs

Three things make a brief useful: one objective, honest constraints, and room for the production company to think.

Everything else is context. A two-page brief that is clear about those three will get you a better idea and a more accurate number than a twenty-page deck that hedges on all of them.

A one-page template

  • The objective. One sentence. What should this film make someone do or believe?
  • The audience. Who, and what they currently think.
  • The single message. If they remember one thing, what is it?
  • Where it runs. Channels, placements and run times.
  • Deliverables. Everything you need, including cutdowns, ratios and stills.
  • Budget. A range is fine. A range is much better than nothing.
  • Timing. Air date, and any fixed dates in between.
  • Mandatories. Legal copy, brand rules, product shots, anything that must appear.
  • What we are not sure about. The most useful section in the document.

Be specific about constraints

Withholding the budget does not get you a better price. It gets you a proposal scoped for the wrong job, which wastes a round for everyone.

The same goes for immovable dates, products that are not finished, approval chains with five people in them, and the thing your CEO does not like. A production company that knows the constraints designs around them. One that finds out later redesigns, and you pay for the redesign.

Common mistakes

  • Briefing a solution instead of a problem. "We need a 60-second brand film" forecloses the answer. Say what it needs to achieve.
  • Three objectives. A film with three messages communicates none of them.
  • Reference films with no explanation. Say what you like about each one. Otherwise you will get the surface copied and the reason missed.
  • No named decision-maker. If nobody owns the yes, the schedule belongs to whoever answers last.

Send us the brief, even if it is half-finished. We will tell you what is missing and how we would approach it.